Month-end close status: progress, overdue and blocked tasks, and what can start now

One command in the Fund operations pack, available in the CLI, as an MCP tool and as a JavaScript import: fundops close-status.

What it needs, and why

Every input is checked before anything is calculated. tasks and asOf are required; the rest refine the answer.

InputRequiredThe question it asksWhy it matters
tasksyesWhat are the close tasks, with owner, due date, status and dependencies?Progress and readiness come from the task list.
asOfyesWhat date should status be measured at?Overdue depends on it.

Requests it answers

An agent with this pack loaded picks the command from phrasing like that, asks for whatever input is missing, and reports the figures with the method that produced them.

Run it

node bin/wealth-skills.js fundops close-status --as-of 2026-09-07 --tasks '[{"id":"bank","name":"Bank reconciliations","status":"done","due":"2026-09-03"},{"id":"nav","name":"NAV strike","status":"not_started","due":"2026-09-08","dependsOn":["bank"]}]'

Limits it inherits from wealth-fund-ops

The full pack, its other 3 commands and what it deliberately leaves alone are on the Fund operations page.